Eaton EVMA4609X-06 3-Phase Managed PDU 208V 42 Outlets 48A 17.3kW 460P9W 6ft 0U
Distributes 208 V three-phase power across 42 outlets with 48 A and 17.3 kW capacity, managed monitoring and 0U vertical mounting
- 208 V three-phase power feeds 42 outlets for dense server racks
- 48 A and 17.3 kW capacity handles heavy compute loads
- 0U vertical mounting preserves every rack unit for equipment
- 6 ft cord with 460P9W connector allows flexible cabinet placement
- Managed monitoring gives real-time visibility into power consumption per outlet
Three-Phase 208V Managed PDU
The Eaton EVMA4609X-06 distributes three-phase 208V power across 42 outlets in a 0U vertical form factor. It supports a total load of 48A and 17.3kW for high-density server cabinets. A 460P9W input connector and 6 ft cord complete the package.
Suited for data centres needing monitored
This unit fits cabinets that can terminate a 460P9W plug and supply 48A three-phase power. Facilities limited to single-phase feeds or lower amperage service cannot use it without electrical upgrades. Buyers without network management infrastructure lose the monitoring benefit.
460P9W input connector decides fit
The 460P9W plug requires a matching receptacle on the facility side. Verify that the upstream circuit provides three-phase 208V at 48A with this exact connector before ordering.
Privalumai
- 208 V three-phase power feeds 42 outlets for dense server racks
- 48 A and 17.3 kW capacity handles heavy compute loads
- 0U vertical mounting preserves every rack unit for equipment
- 6 ft cord with 460P9W connector allows flexible cabinet placement
- Managed monitoring gives real-time visibility into power consumption per outlet
Specifikacijos
Šiai prekei specifikacijos dar nepaskelbtos.
Klausimai apie šią prekę
How do I mount the 0U vertical PDU in a server cabinet, and what is the common mistake?
Secure the unit vertically along the rack’s 0U channel using the supplied brackets; the frequent error is leaving the mounting screws loose, which lets the 6 ft cord pull the PDU out of alignment.
Which component will need replacement first during long-term operation?
The IEC outlet modules are the primary wear items; after thousands of insertion cycles the contact springs fatigue and should be swapped to maintain reliable 208V 3-phase delivery.
What limit appears first when the PDU runs continuously at full load?
The 48A / 17.3kW aggregate rating is the first ceiling; sustained draw at that level trips the internal branch circuit protection before any thermal or connector limit is reached.
Taip pat šiame skyriuje
Kiti pirkėjai taip pat lygino
Ta pati lentyna, tas pats atsiskaitymas — aštuonios monetos ir 30 minučių fiksuotas kursas.
Black Box Corporation DisplayPort to DVI Fibre Optic Cable 15 ft 4.5 m 1.35 GB/s
- Consumer Electronics