Eaton
Eaton EVMA4609X-06 3-Phase Managed PDU 208V 42 Outlets 48A 17.3kW 460P9W 6ft 0U
Distributes 208 V three-phase power across 42 outlets with 48 A and 17.3 kW capacity, managed monitoring and 0U vertical mounting
- 208 V three-phase power feeds 42 outlets for dense server racks
- 48 A and 17.3 kW capacity handles heavy compute loads
- 0U vertical mounting preserves every rack unit for equipment
- 6 ft cord with 460P9W connector allows flexible cabinet placement
- Managed monitoring gives real-time visibility into power consumption per outlet
Three-Phase 208V Managed PDU
The Eaton EVMA4609X-06 distributes three-phase 208V power across 42 outlets in a 0U vertical form factor. It supports a total load of 48A and 17.3kW for high-density server cabinets. A 460P9W input connector and 6 ft cord complete the package.
Suited for data centres needing monitored
This unit fits cabinets that can terminate a 460P9W plug and supply 48A three-phase power. Facilities limited to single-phase feeds or lower amperage service cannot use it without electrical upgrades. Buyers without network management infrastructure lose the monitoring benefit.
460P9W input connector decides fit
The 460P9W plug requires a matching receptacle on the facility side. Verify that the upstream circuit provides three-phase 208V at 48A with this exact connector before ordering.
จุดเด่น
- 208 V three-phase power feeds 42 outlets for dense server racks
- 48 A and 17.3 kW capacity handles heavy compute loads
- 0U vertical mounting preserves every rack unit for equipment
- 6 ft cord with 460P9W connector allows flexible cabinet placement
- Managed monitoring gives real-time visibility into power consumption per outlet
ข้อมูลจำเพาะ
ยังไม่มีข้อมูลจำเพาะที่เผยแพร่สำหรับสินค้านี้
คำถามเกี่ยวกับสินค้านี้
How do I mount the 0U vertical PDU in a server cabinet, and what is the common mistake?
Secure the unit vertically along the rack’s 0U channel using the supplied brackets; the frequent error is leaving the mounting screws loose, which lets the 6 ft cord pull the PDU out of alignment.
Which component will need replacement first during long-term operation?
The IEC outlet modules are the primary wear items; after thousands of insertion cycles the contact springs fatigue and should be swapped to maintain reliable 208V 3-phase delivery.
What limit appears first when the PDU runs continuously at full load?
The 48A / 17.3kW aggregate rating is the first ceiling; sustained draw at that level trips the internal branch circuit protection before any thermal or connector limit is reached.
อื่น ๆ ในหมวดนี้
ลูกค้ามักเปรียบเทียบสินค้าเหล่านี้
หมวดเดียวกัน การชำระเงินแบบเดียวกัน — แปดสกุลเงินคริปโตและอัตราแลกเปลี่ยนที่ล็อกไว้ 30 นาที
Black Box Corporation DisplayPort to DVI Fibre Optic Cable 15 ft 4.5 m 1.35 GB/s
- Consumer Electronics



