Eaton EVMA4609X-06 3-Phase Managed PDU 208V 42 Outlets 48A 17.3kW 460P9W 6ft 0U

SKU CH-Q67A-TBDGV MPN EVMA4609X-06

Distributes 208 V three-phase power across 42 outlets with 48 A and 17.3 kW capacity, managed monitoring and 0U vertical mounting

  • 208 V three-phase power feeds 42 outlets for dense server racks
  • 48 A and 17.3 kW capacity handles heavy compute loads
  • 0U vertical mounting preserves every rack unit for equipment
  • 6 ft cord with 460P9W connector allows flexible cabinet placement
  • Managed monitoring gives real-time visibility into power consumption per outlet

Three-Phase 208V Managed PDU

The Eaton EVMA4609X-06 distributes three-phase 208V power across 42 outlets in a 0U vertical form factor. It supports a total load of 48A and 17.3kW for high-density server cabinets. A 460P9W input connector and 6 ft cord complete the package.

Suited for data centres needing monitored

This unit fits cabinets that can terminate a 460P9W plug and supply 48A three-phase power. Facilities limited to single-phase feeds or lower amperage service cannot use it without electrical upgrades. Buyers without network management infrastructure lose the monitoring benefit.

460P9W input connector decides fit

The 460P9W plug requires a matching receptacle on the facility side. Verify that the upstream circuit provides three-phase 208V at 48A with this exact connector before ordering.

商品特色

  • 208 V three-phase power feeds 42 outlets for dense server racks
  • 48 A and 17.3 kW capacity handles heavy compute loads
  • 0U vertical mounting preserves every rack unit for equipment
  • 6 ft cord with 460P9W connector allows flexible cabinet placement
  • Managed monitoring gives real-time visibility into power consumption per outlet

商品規格

本商品目前尚未公佈規格。

商品問答

How do I mount the 0U vertical PDU in a server cabinet, and what is the common mistake?

Secure the unit vertically along the rack’s 0U channel using the supplied brackets; the frequent error is leaving the mounting screws loose, which lets the 6 ft cord pull the PDU out of alignment.

Which component will need replacement first during long-term operation?

The IEC outlet modules are the primary wear items; after thousands of insertion cycles the contact springs fatigue and should be swapped to maintain reliable 208V 3-phase delivery.

What limit appears first when the PDU runs continuously at full load?

The 48A / 17.3kW aggregate rating is the first ceiling; sustained draw at that level trips the internal branch circuit protection before any thermal or connector limit is reached.

同類商品