Vertiv
Vertiv AL5A0NHUGNNXLKB UPS 5kVA/4.5kW 208/120V 8min runtime
Double-conversion online UPS delivering 5kVA and 4.5kW with lithium-ion battery providing 8 minutes at full load and 17 minutes at half load
- International Version208V
- Input Voltage Range200/100, 208/120, 220/110, 230/115, 240/120 VAC
- Input Frequency40 Hz to 70 Hz auto-sensing
- Input Connection4-Wire (L-L-N-G)
- VA Rating5kVA
- Watts4.5kW
Option AL5A0NHUGNNXLKB
- Double-conversion online topology protects critical loads
- 5kVA and 4.5kW capacity supports dense server racks
- Lithium-ion battery delivers 8 minutes at full load
- Hot-swappable power, battery and control modules enable zero-downtime maintenance
- Wide 200–240 VAC input range adapts to global power grids
Vertiv 5kVA Double-Conversion UPS
The Vertiv Liebert AL5A0NHUGNNXLKB is a 5kVA double-conversion online UPS rated at 4.5kW. It accepts 208/120VAC input through a 4-wire L-L-N-G connection and delivers configurable 50/60Hz output. Lithium-ion batteries provide 8 minutes of runtime at full load. Hot-swappable power, battery and control modules allow maintenance without interrupting connected equipment.
Suits critical loads needing continuous clean power
This unit serves server rooms, network closets and industrial systems that require true online topology and hot-swap serviceability. The 27 x 17 x 32 inch rack/tower form factor fits standard enclosures. Facilities that need longer battery autonomy at full load or a different voltage architecture should evaluate alternative models.
8-minute full-load runtime from lithium-ion cells
At 100 percent load the battery bank delivers 8 minutes; at half load it extends to 17 minutes. This single figure determines whether the UPS covers the gap to generator start or orderly shutdown for your specific load profile.
Põhijooned
- Double-conversion online topology protects critical loads
- 5kVA and 4.5kW capacity supports dense server racks
- Lithium-ion battery delivers 8 minutes at full load
- Hot-swappable power, battery and control modules enable zero-downtime maintenance
- Wide 200–240 VAC input range adapts to global power grids
Tehnilised andmed
| Brand | Vertiv |
|---|---|
| Series | Liebert |
| Model | AL5A0NHUGNNXLKB |
| International Version | 208V |
| Input Voltage Range | 200/100, 208/120, 220/110, 230/115, 240/120 VAC |
| Input Frequency | 40 Hz to 70 Hz auto-sensing |
| Input Connection | 4-Wire (L-L-N-G) |
| VA Rating | 5kVA |
| Watts | 4.5kW |
| Output Voltage | 200/100, 208/120, 220/110, 230/115, 240/120 VAC |
| Output Frequency | 60Hz default; 50/60Hz user-configurable |
| Battery Type | Lithium Ion |
| Battery Run Time | Full Load: 8 mins. Half Load: 17 mins. |
| Temperature | Operating temperature: 32°F - 104°F (0°C - 40°C) |
| Humidity | 0 - 95%, non-condensing |
| Dimensions | 27" x 17" x 32" |
| Weight | 321 lbs. |
| Tarnekaal | 145.60 kg |
| Pakendi mõõtmed | 813 × 686 × 432 mm |
Selle mudeli teised versioonid
5 veel samast sarjast
Sama seeria, erinev mälumaht, jahutus või taktsagedus — võrrelge enne otsustamist.
Vertiv AS6A0NCUGNNXLKB 5 kVA UPS 4.5 kW 5 min runtime
- 208V
- 200/100, 208/120, 2…
Vertiv AS3A0NCUGNNXLKB 5 kVA 4.5 kW 208 V 5 min runtime UPS
- 208V
- 200/208/220/230/240…
Vertiv Liebert AS5B0NCVGNNXLKB 10kVA Scalable to 15kVA N+1 208V Split Phase Modular UPS
- 208V
- 200/100, 208/120, 2…
Vertiv AS6B0NCVGNNXLKB 10kVA 9kW 208V Split Phase UPS 5min Runtime
- 208V
- 200/100, 208/120, 2…
Küsimused selle toote kohta
How do I install the 27" x 17" x 32" rack/tower UPS with its 4-wire L-L-N-G input, and what step do people miss?
Mount the 321 lb unit in a rack or as a tower, connect the 4-wire L-L-N-G input to a 208/120 VAC source, then verify the 60 Hz default output frequency matches your load; the step often missed is confirming the 50/60 Hz user-configurable setting before powering on.
What maintenance or replacement will the lithium-ion battery need later?
The hot-swappable battery module can be replaced without shutting down connected loads; plan replacement when runtime drops below the 8 min full-load or 17 min half-load figures, typically after several years of operation within the 0°C to 40°C range.
What limit appears first during sustained full-load operation?
The 8-minute battery runtime at 4.5 kW is the first hard limit; after that the UPS will shut down unless mains power returns or an external battery cabinet is added.
Veel samast osakonnast
Kliendid võrdlesid neid ka
Sama osakond, sama kassa — kaheksa krüptovaluutat ja 30-minutiline kursilukk.
Black Box Corporation DisplayPort to DVI Fibre Optic Cable 15 ft 4.5 m 1.35 GB/s
- Consumer Electronics








