Acceptăm criptomonede — astfel, criptomonedele pe care le dețineți pot cumpăra echipamente reale.Plătiți în cripto, cheltuiți-o pe echipamente reale. Livrare asigurată gratuită oriunde în lume peste 399 $. Cartoane neutre, fără marcă, expediate din Germania.Livrare asigurată gratuită peste 399 $. Cursul dumneavoastră este blocat timp de 30 de minute de la deschiderea paginii de plată.Curs blocat 30 de minute. Fiecare articol este sigilat, numărul de serie este verificat, iar produsul este acoperit de o garanție de 24 de luni.Sigilat, garantat 24 de luni.

Produse urmărite Conectare

KHACHIMO

KHACHIMO UCS C200 Server Power Supply CPB09-031A R2X0-PSU2-650W-SB

SKU CH-YN0V-JNR5B

650 W ATX power supply tested for UCS C200 server compatibility

  • TypeATX
  • Tested working for reliable server operation
  • 650W output powers UCS C200 systems
  • ATX form factor fits standard server chassis
  • Good quality components ensure stable delivery

KHACHIMO UCS C200 Server Power Supply

The KHACHIMO UCS C200 Server Power Supply CPB09-031A is a new 650W ATX unit tested for working condition. It is built for operators maintaining or repairing Cisco UCS C200 rack servers that require this specific CPB09-031A R2X0-PSU2-650W-SB part number.

650W capacity and server headroom

The 650W rating delivers reliable power for the original C200 configuration under typical loads. It is not suited for upgraded systems drawing significantly more than the factory spec, nor for builds needing redundant hot-swap modules beyond a single replacement unit.

Puncte forte

  • Tested working for reliable server operation
  • 650W output powers UCS C200 systems
  • ATX form factor fits standard server chassis
  • Good quality components ensure stable delivery

Specificații

TypeATX

Întrebări despre acest articol

Will the CPB09-031A power supply work in my older UCS C200 server?

The CPB09-031A is the designated power supply for the UCS C200 server, matching the original part number R2X0-PSU2-650W-SB.

How can I confirm the 650W unit is operating correctly after installation?

The supplier test-works each unit; after installation, verify the server powers on, posts successfully, and runs without unexpected shutdowns under load.

Tot din acest raion

Clienții au comparat și acestea.

Același raion, aceeași finalizare a comenzii — opt monede și un curs blocat 30 de minute.