Prihvaćamo kriptovalute — tako kriptovalute koje posjedujete mogu kupiti pravi hardver.Plaćajte kriptovalutom, trošite je na pravi hardver. Besplatna osigurana dostava diljem svijeta iznad 399 $. Obični vanjski kartoni bez oznaka, otpremaju se iz Njemačke.Besplatna osigurana dostava iznad 399 $. Vaš je tečaj blokiran 30 minuta od otvaranja blagajne.Tečaj blokiran 30 minuta. Svaki je artikl zapečaćen, njegov serijski broj provjeren, i pokriven jamstvom od 24 mjeseca.Zapečaćen, jamstvo 24 mjeseca.

Praćeni artikli Prijava

Vertiv

Vertiv Liebert AS4A0NCUGNNXLKB 5kVA 208V UPS 5min runtime

SKU CH-CGV6-Q64NQ MPN AS4A0NCUGNNXLKB

5 kVA online double-conversion UPS with 5-minute full-load runtime, scalable to 20 kVA N+1, 208 V single-phase input, hot-swappable VRLA batteries, LCD status display, factory-fitted SNMP card.

  • International Version208V
  • Input Voltage Range200/208/220/230/240 VAC
  • Input Frequency40 Hz to 70 Hz auto-sensing
  • Input Connection3-Wire (L-L-G)
  • VA Rating5 kVA
  • Watts4.5 kW
  • 5 kVA scalable to 20 kVA N+1 for mission-critical growth
  • Online double conversion delivers clean 4.5 kW output
  • 5 minutes full-load runtime, 14 minutes at half load
  • Hot-swappable VRLA batteries enable maintenance without downtime
  • LCD status display plus factory-fitted SNMP webcard for remote monitoring

Scalable 5 kVA UPS for mission-critical loads

This Vertiv Liebert UPS delivers 5 kVA and 4.5 kW of online double-conversion power in a rack or tower form factor. It ships new with a factory-installed SNMP web card for network management. The system scales to 20 kVA in an N+1 redundant configuration, protecting mission-critical equipment. Hot-swappable modules allow maintenance without downtime.

Input range and hard-wired installation limits

The unit accepts 200 to 240 VAC across a 40 to 70 Hz auto-sensing window, locking to 60 Hz output by default with 50 Hz user-configurable. It requires a 3-wire L-L-G hard-wired connection, so no plug-and-play cordset is provided. Operation is rated from 32 to 104 Fahrenheit with humidity up to 95 percent non-condensing. These constraints define the electrical and environmental envelope.

Runtime headroom at full and half load

Valve-regulated lead-acid batteries provide 5 minutes at the full 4.5 kW load and 14 minutes at half load. This window suits orderly shutdown or generator start sequences rather than extended ride-through. The 635-pound chassis measures 49 by 17 by 34 inches, demanding substantial floor or rack space. Buyers needing longer autonomy or lighter weight should evaluate additional battery cabinets or alternative topologies.

Istaknuto

  • 5 kVA scalable to 20 kVA N+1 for mission-critical growth
  • Online double conversion delivers clean 4.5 kW output
  • 5 minutes full-load runtime, 14 minutes at half load
  • Hot-swappable VRLA batteries enable maintenance without downtime
  • LCD status display plus factory-fitted SNMP webcard for remote monitoring

Specifikacije

BrandVertiv
SeriesLiebert
ModelAS4A0NCUGNNXLKB
International Version208V
Input Voltage Range200/208/220/230/240 VAC
Input Frequency40 Hz to 70 Hz auto-sensing
Input Connection3-Wire (L-L-G)
VA Rating5 kVA
Watts4.5 kW
Output Frequency60Hz default; 50/60Hz user-configurable
Battery TypeValve Regulated Lead Acid (VRLA)
Battery Run TimeFull Load: 5 mins.
Half Load: 14 mins.
TemperatureOperating temperature: 32°F - 104°F (0°C - 40°C)
Humidity0 - 95%, non-condensing
Dimensions49" x 17" x 34"
Weight635 lbs.
Težina pošiljke288.03 kg
Dimenzije pakiranja1245 × 1245 × 432 mm

Druge verzije ovog modela

još 5 u istoj seriji

Ista obitelj, različita memorija, hladnjak ili frekvencija — usporedite prije kupnje.

Pitanja o ovom artiklu

Should I choose the 5 kVA or the 20 kVA scalable version for my load?

This unit ships as a 5 kVA, 4.5 kW module; you can add up to three more hot-swappable modules later to reach 20 kVA N+1 redundancy.

What does the 5-minute full-load runtime mean for my 4.5 kW equipment?

At the full 4.5 kW draw the internal VRLA batteries will keep the load running for 5 minutes; at half load the same batteries last 14 minutes.

How does the 208 V single-phase 3-wire input affect installation?

The UPS requires a hard-wired 3-wire L-L-G feed at 200–240 VAC and auto-senses 40–70 Hz, so no separate neutral conductor is needed.

Također u ovoj kategoriji

Kupci su usporedili ovo

Ista polica, ista blagajna — osam valuta i blokada tečaja na 30 minuta.