Mining Syndicate
Mining Syndicate Whatsminer M30S 110 Th/s mining hardware
Bitcoin ASIC miner delivering 110 Th/s at 3,472 W, weighs 20 lb and requires 220 V power
- Delivers 110 Th/s hashrate for high Bitcoin output
- Draws 3,472 W for efficient power-to-performance ratio
- Weighs 20 lb for manageable rack installation
- Requires 220 V supply for stable industrial operation
- Includes 12-month manufacturer warranty for purchase protection
Whatsminer M30S 110 Th/s Bitcoin ASIC miner
The Whatsminer M30S is a dedicated Bitcoin ASIC miner delivering a hash rate of 110 Th/s. It draws 3,472 Watts and weighs about 20 pounds. The unit is supplied new with a 12-month manufacturer warranty.
Suited for operators with 220 V power
This hardware requires a 220 V outlet; a small step-down transformer will not work. The miner runs very loud and generates intense heat, so significant airflow is essential. Buyers without access to 220 V supply or adequate cooling should consider other options.
110 Th/s hash rate at 3,472 Watts power draw
The single specification that determines suitability is the 110 Th/s throughput at 3,472 Watts. Match this ratio to your electricity cost and cooling capacity to decide if the unit fits your operation.
Points forts
- Delivers 110 Th/s hashrate for high Bitcoin output
- Draws 3,472 W for efficient power-to-performance ratio
- Weighs 20 lb for manageable rack installation
- Requires 220 V supply for stable industrial operation
- Includes 12-month manufacturer warranty for purchase protection
Caractéristiques
Aucune caractéristique publiée pour cet article pour l’instant.
Questions sur cet article
What power draw does the 110 Th/s hash rate cap at in practice?
The unit draws 3,472 watts while delivering 110 Th/s, so the power interface must supply that full load continuously.
What outlet and space are needed to fit the 20-pound miner?
A 220 V outlet is required; a small step-down transformer will not work, and the chassis needs clear airflow for heat exhaust.
How is the miner installed and what step do people miss?
Connect the 220 V supply, attach network, power on, then configure the pool; the step often missed is providing enough ventilation for the hot exhaust.
Également dans ce rayon
Les clients ont aussi comparé
Même rayon, même caisse — huit monnaies et un taux bloqué 30 minutes.
PrimoChill Praxis Wetbench Open-Air Test Bench 461.8mm
- Open-Air
SilverStone Technology Strider 1200W 80 Plus Platinum Modular Power Supply
- ATX Mid Tower
- 1200W



